FAQ #233

Have a question? Try asking one of our Experts

What is the preferred method of construction of stall flooring from the base up?

Related resource areas: Horses

Stall flooring preferences vary with facilities; however, here are some general recommendations for dirt floor stalls.

First, the barn site should be elevated several feet from the surrounding area with a suitable pad. This decreases incidence of water infiltration into stalls from surrounding runoff.

Second, the sub-base of the stalls must allow for drainage: 8 inches to one foot of small rock (inch rock) is a suitable material. Above this sub-base, place about one foot of clay to clay-loam type soil.
This base will provide percolation of urine to the sub-base, yet should pack enough to provide a level floor. Bedding should be placed above the soil base.

Exceptions to this include barns that use wood flooring above a rock sub-base instead of soil and barns that use sloped concrete floors with rubber matting instead of the rock and soil base. No matter, use of bedding that absorbs moisture assists in decreasing need for percolation and drainage.

Have a specific question? Try asking one of our Experts

Unlike most other resources on the web, we have experts from Universities around the country ready to answer your questions.

Comments

Post a comment about this topic

Please keep comments on topic. To ask a question, please use Ask an Expert. All comments are held for moderation. Comments that include profanity, personal attacks or other inappropriate material will not be posted to the site.

Did you find this page useful?

No one has rated this article yet. Why not be the first? what is this?
not useful
very useful
 1  2  3  4  5