The systems were designed by engineers selected by the feedlot operators. In some cases, the basins were designed to hold the capacity from a 25-year, 24-hour storm, and, in other cases, the capacity for the 25-year, 24-hour storm was built within the whole VTS system.
Author: Lara Moody, Iowa State University