Facilities must consider the sustainable supply within a reasonable haul time, as well as the existing demand for wood resources when placing a wood-fired power plant. If a one-hour haul time is reasonable, then power plants would be at least two hours apart. This FAQ was adapted from Wood to Energy and used with permission.
